CornHillArtsFestival.com | CornHillHolidayTourofHomes.com | Corn Hill Store

CORN HILL CROSSWALK RENOVATIONS

2 Flares Filament.io Made with Flare More Info'> 2 Flares ×

Decrotive CrosswalkThe City plans on replacing brick crosswalks with a decorative stamped asphalt (http://www.streetprint.com) this spring in the Corn Hill Neighborhood.

ADA compliant ramps will be installed as needed at all of these locations.

The work could take as long as a month depending on how the contractor schedules the job and how the weather cooperates.  Disruption should be minimal.

The south Plymouth Avenue project is still anticipated to start sometime this summer after the Corn Hill Arts Festival.

  • Atkinson St. / Eagle St. – Intersection repaved & crosswalks replaced
  • Atkinson St. / Greenwood St. – Intersection repaved & crosswalks replaced
  • Atkinson St. / S. Washington St. – Intersection repaved & crosswalks replaced
  • Troup St. / Livingston Park / Eagle St. – Intersection repaved & crosswalks replaced
  • Troup St. / Greenwood St. – Intersection repaved & crosswalks replaced
  • Troup St. / S. Washington St. – Intersection repaved & crosswalks replaced
  • Clarissa St. / Greig St. – crosswalks replaced
  • Frederick Douglas St. / Adams St. – crosswalks replaced
2 Flares Facebook 1 Twitter 1 Google+ 0 LinkedIn 0 Reddit 0 StumbleUpon 0 Email -- Filament.io Made with Flare More Info'> 2 Flares ×

Leave a comment

*